PROVEN WORLDWIDE

Real results from real installations

Discover how Hydropath® technology delivers sustainable, chemical-free water treatment across industries and continents.

  • Reverse osmosis system with high-pressure pumps and membrane pressure vessels at a coatings factory in EindhovenManufacturing

    Eindhoven Coatings Factory: RO Flow Decline Slowed ~70%

    HydroFLOW® slowed RO permeate-flow decline by about 70% at an Eindhoven coatings factory, holding 4,400 L/h after four weeks. Both units were bought.

    ~70% slower flow decline
    4,400
    L/h held after 4 weeks
    Both units purchased
  • Reverse osmosis system for PCB wastewater reuse, Guangdong, ChinaManufacturing

    Guangdong PCB Factory: RO Output Doubled From 12 to 24 t/h

    HydroFLOW® helped double RO output from 12 to 24 tonnes an hour in 15 days at a Guangdong PCB factory, with permeate conductivity down about two-thirds.

    RO output doubled in 15 days
    ~67% lower permeate conductivity
    4 more
    units ordered
  • Las Vegas Strip with casino resort towers, NevadaCooling Tower

    Las Vegas Resort: 8M Gallons of Cooling Water Saved a Year

    Two HydroFLOW® i190 units cut blowdown at a Las Vegas resort’s cooling tower, saving an estimated 8 million US gallons and $47,000 a year.

    8M
    gallons water saved/year
    ~$47k estimated annual saving
    Sulphuric acid eliminated
  • Belt press equipment and pipework at Guelph WWTP, OntarioWaste Water

    Guelph WWTP: Belt Press Downtime Cut From 3 Days to 6 Hours

    A HydroFLOW® i160 trial on a Guelph WWTP belt press recorded no new struvite over 60+ days, while maintenance downtime fell from three days to six hours.

    No new struvite in 60+ days
    Downtime 3 days to 6 hours
    $16–40k a year avoided
  • Dewatering centrifuges in the centrifuge hall at Woodward Avenue WWTP, HamiltonWaste Water

    Woodward Avenue WWTP: Centrifuge Ports Kept Clear of Struvite

    A HydroFLOW® i160 kept centrifuge ports and centrate pipework clear of struvite at Hamilton’s Woodward Avenue WWTP, with payback under a year.

    No port or pipe blockages
    $50k+ projected yearly saving
    Payback under 1 year
  • Aerial view of a wastewater treatment plant with clarifier tanks, BolognaWaste Water

    HERA Bologna: Sludge Shredder Ran 65 Days Without Stopping

    A HydroFLOW® i160 kept HERA’s Bologna sludge shredder running for at least 65 days without a struvite stoppage, against 20 to 30 days before.

    65 days
    without interruption
    3x
    longer maintenance intervals
    Trial units bought
  • Indoor competition pool with lane ropes at Mountain View Aquatic Center, Cobb County, GeorgiaSwimming Pool

    Mountain View Aquatic Center: UV Off, Running Costs Down 93%

    HydroFLOW® let Mountain View Aquatic Center turn its UV system off, cutting estimated power and maintenance costs by 93% while water clarity held.

    UV system turned off
    93%
    lower yearly running cost
    19%
    shorter backwash
  • Indoor swimming pool with lanes and a water slide at Lyle Hallman pool, KitchenerSwimming Pool

    Lyle Hallman Pool: 51% Less Chlorine, No Shock Treatments

    HydroFLOW® cut daily chlorine use by 51% at Kitchener’s Lyle Hallman indoor pool, with no shock treatments needed and less chlorine smell.

    51%
    less chlorine used
    0 shock
    treatments needed
    $8,300
    calculated annual saving
  • Outdoor municipal swimming pool in Wapato, Washington, with swimmers on the poolsideSwimming Pool

    Wapato Pool: 65% Less Backwashing, 50% Less Chlorine

    HydroFLOW® cut backwashing by 65% at a 375,000-gallon municipal pool in Washington, halved chlorine use and cut filter media from 60 to 20 bags a season.

    65%
    less backwashing
    50%
    less chlorine
    5-month reported payback
  • Aerial view of the PepsiCo Walkers crisp factory in Leicester, HydroFLOW spray nozzle scale treatment case studyFood Industry

    PepsiCo Walkers: 24 Weeks of Clear 200-Micron Nozzles

    PepsiCo Walkers in Leicester kept 200 micron spray nozzles clear for 24 weeks with one HydroFLOW® i45, ending weekly acid cleaning and production stoppages.

    24 weeks
    without cleaning
    Estimated 95% lower cleaning cost
    147 hours
    of downtime avoided
  • Aerial view of the centrate line and centrifuge at East Hyde works, LutonWaste Water

    Luton WWTP: No New Struvite Scale in Centrate Lines

    A HydroFLOW unit prevented further struvite scaling in centrate lines at Thames Water's East Hyde works in Luton.

    0 new
    scale formation
    6 month
    trial duration
    Reduced maintenance demand
  • Aerial view of the dewatering centrifuge site at Esholt WWTP, YorkshireWaste Water

    Yorkshire WWTP: 11% Less Polymer in Dewatering

    HydroFLOW i160 cut polymer demand 11% in sludge dewatering at Yorkshire Water's Esholt plant, output quality held.

    11%
    centrifuge polymer cut
    Lower centrifuge stress
    Output quality maintained
  • Belt press top deck at Thames Water Banbury, UKWaste Water

    Banbury UK WWTP: 200 l/hr Polymer Saved on Belt Press

    A HydroFLOW i120 trial at Thames Water Banbury improved belt press floc stability, cutting polymer dosing while maintaining operation.

    200
    l/hr polymer saved
    18%
    cake solids maintained
    Instant floc response
  • Tims Dairy processing site in Buckinghamshire, HydroFLOW plate heat exchanger scale treatment case studyFood Industry

    Tims Dairy: Milk-Line Cleans and Acid Use Both Halved

    Tims Dairy in Buckinghamshire halved milk line cleaning frequency and halved phosphoric acid per clean with four HydroFLOW® units, including a C45.

    50%
    fewer milk-line cleans
    50%
    less acid per clean
    Less lost production