- 200
- l/hr polymer saved
- 18%
- cake solids maintained
- Instant floc response

Banbury UK WWTP: 200 l/hr Polymer Saved on Belt Press
- KEY RESULTS
Summary
Polymer use on the belt press fell by 200 litres an hour, with stable floc and stable operation at reduced dosing. The floc broke down rapidly when the unit was turned off, confirming the treatment effect, and stable operation was achieved over a wider dosing range.
Belt press polymer saving through floc stability
A belt press polymer saving was out of reach at Banbury wastewater treatment works, because any cut in dosing risked floc breakdown and an unstable press. High polymer dosing was needed simply to hold the floc stable. One HydroFLOW® i120 was fitted to the sludge feed pipe and tested across stepwise dosing reductions. The floc held and belt press operation was stable at reduced dosing. When the unit was switched off, the floc broke down rapidly, confirming the treatment effect. The saving reached 200 litres of polymer an hour.
Project Details
The Challenges
- A belt press polymer saving was blocked by floc going unstable at lower dosing
- High polymer dosing was required to hold floc stability
- Any reduction in dosing risked floc breakdown
- Belt press operation became unstable when dosing dropped
The Solution
- Unit installed: one HydroFLOW® i120
- Installation point: sludge feed pipe to the belt press
- Trial: stepwise dosing reduction, plus a switch-off check
To test whether a belt press polymer saving was real, the unit was fitted to the sludge feed pipe and polymer dosing was reduced in steps. The treatment improved floc stability, allowing reduced polymer dosing while maintaining operation. When the unit was turned off, the floc broke down rapidly, confirming the treatment effect.
Key Outcomes
Stable operation at 745 l/hr reduced dosing
Floc broke down rapidly when unit turned off
Cake solids maintained at reduced dosing
Stable floc held over a wider dosing range
Independent Verification
All results in this study were measured and verified by third-party facilities managers and technical staff.
Ready to see more?
Other Case Studies
Manufacturing
Guangdong PCB Factory: RO Output Doubled From 12 to 24 t/h
HydroFLOW® helped double RO output from 12 to 24 tonnes an hour in 15 days at a Guangdong PCB factory, with permeate conductivity down about two-thirds.
- RO output doubled in 15 days
- ~67% lower permeate conductivity
- 4 more
- units ordered
Waste Water
Guelph WWTP: Belt Press Downtime Cut From 3 Days to 6 Hours
A HydroFLOW® i160 trial on a Guelph WWTP belt press recorded no new struvite over 60+ days, while maintenance downtime fell from three days to six hours.
- No new struvite in 60+ days
- Downtime 3 days to 6 hours
- $16–40k a year avoided
Waste Water
Woodward Avenue WWTP: Centrifuge Ports Kept Clear of Struvite
A HydroFLOW® i160 kept centrifuge ports and centrate pipework clear of struvite at Hamilton’s Woodward Avenue WWTP, with payback under a year.
- No port or pipe blockages
- $50k+ projected yearly saving
- Payback under 1 year
