Reverse osmosis system for PCB wastewater reuse, Guangdong, China

Guangdong PCB Factory: RO Output Doubled From 12 to 24 t/h

  • KEY RESULTS
    RO output doubled in 15 days
    ~67% lower permeate conductivity
    4 more
    units ordered

Summary

At a PCB factory in Guangdong, HydroFLOW® treatment helped restore reverse osmosis performance, doubling output from 12 to 24 tonnes an hour within 15 days and cutting permeate conductivity by about two-thirds, with lower pumping pressure. The original study also reported estimated savings of 17,000 tonnes of water and 172,800 kWh of pumping energy a year. Following the trial, the factory ordered four more HydroFLOW® units.

PCB wastewater reverse osmosis in Guangdong

PCB wastewater reverse osmosis was falling well short of its design at a printed circuit board factory in Guangdong, China, which treats its production wastewater by RO so it can be reused in cooling towers and for cleaning. The RO system was designed for 25 tonnes an hour, but scale meant it produced only 12 tonnes an hour even after a chemical wash, dropping to 8.5 tonnes an hour within 30 days, and permeate conductivity was around 45 µS. A HydroFLOW® unit was installed on the RO system and evaluated over 15 days. Output rose by 50% within a day and reached 24 tonnes an hour by day 15, with lower pumping pressure and permeate conductivity down by about two-thirds.

Before: 12 t/h RO output after chemical washing, 25 t/h design capacity. After: 24 t/h RO output after 15 days, 96% of design capacity

The Challenges

  • PCB wastewater reverse osmosis output was 12 t/h even after chemical washing, against a 25 t/h design
  • Scale could cut throughput to 8.5 t/h within 30 days
  • Permeate conductivity was around 45 µS
  • Treated wastewater was reused in cooling and cleaning applications

The Solution

  • Unit installed: one HydroFLOW® unit
  • Installation point: the factory’s RO system
  • RO design capacity: 25 tonnes an hour
  • Trial: 15 days, monitoring output, pumping pressure and permeate conductivity

To see whether PCB wastewater reverse osmosis could be brought back towards its design output, the unit was fitted to the factory’s RO system and RO output, pumping pressure and permeate conductivity were monitored over the 15-day evaluation. Flow held near 24 t/h for ten days, then fell to 18 t/h after two months.

Key Outcomes

  • RO output 12 to 24 t/h

  • 17,000 t water a year (reported)

  • ~67% lower permeate conductivity

  • 172,800 kWh a year (reported)

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Other Case Studies

  • Reverse osmosis system with high-pressure pumps and membrane pressure vessels at a coatings factory in EindhovenManufacturing

    Eindhoven Coatings Factory: RO Flow Decline Slowed ~70%

    HydroFLOW® slowed RO permeate-flow decline by about 70% at an Eindhoven coatings factory, holding 4,400 L/h after four weeks. Both units were bought.

    ~70% slower flow decline
    4,400
    L/h held after 4 weeks
    Both units purchased
  • Belt press equipment and pipework at Guelph WWTP, OntarioWaste Water

    Guelph WWTP: Belt Press Downtime Cut From 3 Days to 6 Hours

    A HydroFLOW® i160 trial on a Guelph WWTP belt press recorded no new struvite over 60+ days, while maintenance downtime fell from three days to six hours.

    No new struvite in 60+ days
    Downtime 3 days to 6 hours
    $16–40k a year avoided
  • Dewatering centrifuges in the centrifuge hall at Woodward Avenue WWTP, HamiltonWaste Water

    Woodward Avenue WWTP: Centrifuge Ports Kept Clear of Struvite

    A HydroFLOW® i160 kept centrifuge ports and centrate pipework clear of struvite at Hamilton’s Woodward Avenue WWTP, with payback under a year.

    No port or pipe blockages
    $50k+ projected yearly saving
    Payback under 1 year