- No port or pipe blockages
- $50k+ projected yearly saving
- Payback under 1 year

Woodward Avenue WWTP: Centrifuge Ports Kept Clear of Struvite
- KEY RESULTS
Summary
At Woodward Avenue WWTP, a HydroFLOW® i160 on the sludge feed stopped struvite blocking the centrifuge ports and centrate discharge pipes. What remained was softer and easier to wash off, slot-ring damage stopped and barrel damage almost ended, with projected savings above $50,000 a year per centrifuge and a reported payback under a year. The centrifuges also ran substantially longer between maintenance interventions.
Centrifuge struvite control at Woodward Avenue WWTP
Centrifuge struvite control was a costly problem at Woodward Avenue Wastewater Treatment Plant in Hamilton, Ontario, which has a reported average capacity of 409 million litres a day and dewaters digested sludge on four Alfa Laval G2 centrifuges. Struvite built up after around 400 operating hours, blocking machine ports and centrate discharge pipework and abrading the barrel and slot-ring surfaces, and an off-site barrel rebuild cost more than $70,000 and took weeks. One HydroFLOW® i160 was installed on the stainless-steel sludge feed line about 6 ft before a G2 centrifuge for a three-month trial. The ports and pipework stayed clear, the remaining deposits washed off more easily, and projected savings exceeded $50,000 a year per centrifuge.
The Challenges
- Centrifuge struvite control was needed on four Alfa Laval G2 centrifuges
- Significant deposits could develop after around 400 operating hours
- Centrate discharge piping and machine ports became blocked
- Hard build-up abraded the barrel and slot-ring surfaces
- An off-site barrel rebuild cost more than $70,000 and took weeks
Project Details

The Solution
- Unit installed: one HydroFLOW® i160
- Installation point: sludge feed line, about 6 ft before the centrifuge
- Pipe: 6-inch stainless steel
- Trial: three months on site
For centrifuge struvite control at the source, the i160 was fitted to the incoming sludge feed line about 6 ft upstream of one G2 centrifuge, and the signal was checked at installation. Over the three-month trial, the centrifuge, its ports and the centrate discharge pipework were inspected and compared with their condition before treatment.
Testimonial
“Well, I put my backside on the line to try this technology and I am very pleased with the results, it has done what we were told it would do”
— Darren Lister, Mechanical Supervisor
Key Outcomes
No port or pipe blockages
$50k+ a year projected per centrifuge
Softer, washable deposits
Payback under 1 year
Independent Verification
All results in this study were measured and verified by third-party facilities managers and technical staff.
Ready to see more?
Other Case Studies
Manufacturing
Guangdong PCB Factory: RO Output Doubled From 12 to 24 t/h
HydroFLOW® helped double RO output from 12 to 24 tonnes an hour in 15 days at a Guangdong PCB factory, with permeate conductivity down about two-thirds.
- RO output doubled in 15 days
- ~67% lower permeate conductivity
- 4 more
- units ordered
Waste Water
Guelph WWTP: Belt Press Downtime Cut From 3 Days to 6 Hours
A HydroFLOW® i160 trial on a Guelph WWTP belt press recorded no new struvite over 60+ days, while maintenance downtime fell from three days to six hours.
- No new struvite in 60+ days
- Downtime 3 days to 6 hours
- $16–40k a year avoided
Waste Water
HERA Bologna: Sludge Shredder Ran 65 Days Without Stopping
A HydroFLOW® i160 kept HERA’s Bologna sludge shredder running for at least 65 days without a struvite stoppage, against 20 to 30 days before.
- 65 days
- without interruption
- 3x
- longer maintenance intervals
- Trial units bought