HERA Bologna: Sludge Shredder Ran 65 Days Without Stopping
- KEY RESULTS
Summary
A HydroFLOW® i160 on the sludge feed line kept HERA’s Bologna sludge shredder running for at least 65 days without interruption, where struvite had stopped it every 20 to 30 days. Maintenance intervals tripled, less fouling built up on the blades, and HERA later bought the units used in the trial.
Sludge shredder struvite at HERA’s Bologna plant
Sludge shredder struvite was forcing shutdowns at HERA S.p.A.’s Bologna wastewater treatment plant. HERA serves around four million people across Italy, and at Bologna sticky struvite deposits kept forming on a sewage sludge shredder, blocking the blades, cutting flow and stopping the plant every 20 to 30 days for cleaning and descaling. One HydroFLOW® i160 was installed on the sludge feed line to the shredder in September 2019, with 24-hour remote monitoring throughout the trial. The shredder then ran for at least 65 days without interruption, maintenance intervals tripled and HERA went on to buy the trial units.
The Challenge
- Sludge shredder struvite was blocking the shredder blades
- Sticky deposits reduced flow on the sludge line
- Shutdowns came every 20 to 30 days
- Frequent cleaning and descaling were needed
Project Details

The Solution
- Unit installed: one HydroFLOW® i160
- Installation point: sludge feed line supplying the shredder
- Commissioned: 15 September 2019
- Monitoring: 24-hour remote monitoring throughout the trial
To tackle sludge shredder struvite at its source, the i160 went on the sludge feed line, so the sludge was treated before it reached the shredder. The unit was monitored remotely around the clock during the trial, and the shredder blades were inspected and photographed after 18 and 65 days of treatment, for comparison with their condition after 20 days without it.
Testimonial
“The customer said he was completely satisfied with the use of Hydropath technology for preventing struvite fouling on the sewage sludge line.”
— HERA S.p.A.
Key Outcomes
65+ days continuous running
Fewer plant shutdowns
3x longer between cleans
Trial units bought
Independent Verification
All results in this study were measured and verified by third-party facilities managers and technical staff.
Ready to see more?
Other Case Studies
Manufacturing
Guangdong PCB Factory: RO Output Doubled From 12 to 24 t/h
HydroFLOW® helped double RO output from 12 to 24 tonnes an hour in 15 days at a Guangdong PCB factory, with permeate conductivity down about two-thirds.
- RO output doubled in 15 days
- ~67% lower permeate conductivity
- 4 more
- units ordered
Waste Water
Guelph WWTP: Belt Press Downtime Cut From 3 Days to 6 Hours
A HydroFLOW® i160 trial on a Guelph WWTP belt press recorded no new struvite over 60+ days, while maintenance downtime fell from three days to six hours.
- No new struvite in 60+ days
- Downtime 3 days to 6 hours
- $16–40k a year avoided
Waste Water
Woodward Avenue WWTP: Centrifuge Ports Kept Clear of Struvite
A HydroFLOW® i160 kept centrifuge ports and centrate pipework clear of struvite at Hamilton’s Woodward Avenue WWTP, with payback under a year.
- No port or pipe blockages
- $50k+ projected yearly saving
- Payback under 1 year