Luton WWTP: No New Struvite Scale in Centrate Lines

  • KEY RESULTS
    0 new
    scale formation
    6 month
    trial duration
    Reduced maintenance demand

Summary

No new struvite scale formed across the six-month trial, maintenance intervention fell and the centrifuge operated more efficiently. Longer service intervals were achieved, and the purchase decision was based on reduced maintenance costs.

Centrate line struvite scale at a sewage works

Centrate line struvite scale at East Hyde Sewage Works, Luton, was severe and reappeared within weeks of every clean. Maintenance was frequent, pipes were being bypassed to keep the plant running, and limited access made internal inspection difficult. One HydroFLOW® unit was fitted to the sludge feed pipe for a six-month trial, mounted in the ceiling of an adjacent building chosen for access and power supply. No new struvite scale formed for the duration. Maintenance intervention fell and the centrifuge ran more efficiently.

The Challenges

  • Centrate line struvite scale was severe and recurring
  • Scaling reappeared within weeks of each clean
  • Frequent maintenance and pipe bypassing were needed to keep running
  • Limited access made internal inspection difficult
  • The centrifuge needed frequent maintenance
Centrate pipe before and after treatment at East Hyde

The Solution

  • Unit installed: One HydroFLOW® unit
  • Installation point: sludge feed pipe, mounted in the ceiling of an adjacent building
  • Trial: six months

The unit was fitted to the sludge feed pipe from the ceiling of an adjacent building, a position chosen for access and power supply. The treatment was aimed at controlling struvite scaling in the centrate line. Over the six-month trial no new centrate line struvite scale formed, maintenance intervention fell and centrifuge efficiency improved.

Key Outcomes

  • No additional scale during the 6-month trial

  • Centrifuge operated more efficiently

  • Lower maintenance from stable scale conditions

  • Longer service intervals achieved

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Other Case Studies

  • Reverse osmosis system for PCB wastewater reuse, Guangdong, ChinaManufacturing

    Guangdong PCB Factory: RO Output Doubled From 12 to 24 t/h

    HydroFLOW® helped double RO output from 12 to 24 tonnes an hour in 15 days at a Guangdong PCB factory, with permeate conductivity down about two-thirds.

    RO output doubled in 15 days
    ~67% lower permeate conductivity
    4 more
    units ordered
  • Belt press equipment and pipework at Guelph WWTP, OntarioWaste Water

    Guelph WWTP: Belt Press Downtime Cut From 3 Days to 6 Hours

    A HydroFLOW® i160 trial on a Guelph WWTP belt press recorded no new struvite over 60+ days, while maintenance downtime fell from three days to six hours.

    No new struvite in 60+ days
    Downtime 3 days to 6 hours
    $16–40k a year avoided
  • Dewatering centrifuges in the centrifuge hall at Woodward Avenue WWTP, HamiltonWaste Water

    Woodward Avenue WWTP: Centrifuge Ports Kept Clear of Struvite

    A HydroFLOW® i160 kept centrifuge ports and centrate pipework clear of struvite at Hamilton’s Woodward Avenue WWTP, with payback under a year.

    No port or pipe blockages
    $50k+ projected yearly saving
    Payback under 1 year