Yorkshire WWTP: 11% Less Polymer in Dewatering

  • KEY RESULTS
    11%
    centrifuge polymer cut
    Lower centrifuge stress
    Output quality maintained

Summary

The trial cut polymer use by 11% on matched centrifuge runs while cake dryness and centrate TSS stayed within acceptable operating limits. Higher differential RPM on the treated line indicated lower centrifuge stress, and switching the unit off quickly caused visible loss of flocculation.

Sludge dewatering polymer reduction on a centrifuge

Sludge dewatering polymer reduction was the goal at a Yorkshire wastewater treatment works dosing heavily with polymer on its dewatering centrifuges. The works could not simply dose less: cutting polymer risked floc loss, cake dryness had to be held near 21% to feed the thermal hydrolysis plant, and centrate quality had to stay within process limits. During an October to November 2018 trial, one HydroFLOW® i160 was fitted to the incoming sludge feed pipe before polymer injection on centrifuge 3. Polymer use fell by 11% on matched centrifuge runs, while cake dryness and centrate TSS stayed within acceptable operating limits.

The Challenges

  • Sludge dewatering polymer reduction was needed, with high dosing on the centrifuges
  • Any cut in polymer dosing risked floc loss
  • Cake dryness had to stay near 21% to feed the thermal hydrolysis plant (THP)
  • Centrate quality had to remain within process limits

The Solution

  • Unit installed: one HydroFLOW® i160
  • Installation point: incoming sludge feed pipe, before polymer injection on centrifuge 3
  • Trial: October to November 2018 on centrifuge 3, using matched runs

The works needed sludge dewatering polymer reduction, so the unit was fitted to the sludge feed pipe on centrifuge 3, ahead of polymer injection. Less polymer was used with the HydroFLOW® unit during matched runs, and switching it off quickly caused visible loss of flocculation. Cake dryness and centrate TSS stayed within acceptable operating limits, and higher differential RPM on the treated line indicated lower centrifuge stress.

Key Outcomes

  • Polymer use cut 11% on matched centrifuge runs

  • Cake dryness and centrate TSS within limits

  • Higher differential RPM, lower centrifuge stress

  • Switching unit off caused rapid floc loss

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Other Case Studies

  • Reverse osmosis system for PCB wastewater reuse, Guangdong, ChinaManufacturing

    Guangdong PCB Factory: RO Output Doubled From 12 to 24 t/h

    HydroFLOW® helped double RO output from 12 to 24 tonnes an hour in 15 days at a Guangdong PCB factory, with permeate conductivity down about two-thirds.

    RO output doubled in 15 days
    ~67% lower permeate conductivity
    4 more
    units ordered
  • Belt press equipment and pipework at Guelph WWTP, OntarioWaste Water

    Guelph WWTP: Belt Press Downtime Cut From 3 Days to 6 Hours

    A HydroFLOW® i160 trial on a Guelph WWTP belt press recorded no new struvite over 60+ days, while maintenance downtime fell from three days to six hours.

    No new struvite in 60+ days
    Downtime 3 days to 6 hours
    $16–40k a year avoided
  • Dewatering centrifuges in the centrifuge hall at Woodward Avenue WWTP, HamiltonWaste Water

    Woodward Avenue WWTP: Centrifuge Ports Kept Clear of Struvite

    A HydroFLOW® i160 kept centrifuge ports and centrate pipework clear of struvite at Hamilton’s Woodward Avenue WWTP, with payback under a year.

    No port or pipe blockages
    $50k+ projected yearly saving
    Payback under 1 year